Maintenance Management Return to QRTOGRAPHY
Maintenance records for equipment object

48-SJ-19001

Firewater pump skid packaged unit

ACTIVE
Back to object Open SAP PM maintenance Asset directory
6Total records
5Completed
1Planned or scheduled
12 Jul 2026Next maintenance

Work orders and findings

6 record(s)
DateOrderNotificationWork typeStatusPriorityDisciplineWork centreShort textFindingAction
12 Jul 2026 40001618 50000842 Preventive Planned High Mechanical MECH-48 Monthly firewater pump skid inspection and run test Work not yet started. Inspect package and complete a no-flow automatic-start test.
12 Jun 2026 40001491 50000792 Functional Test Completed High Mechanical MECH-48 Automatic-start and local run test Pump started on simulated low-pressure signal. No abnormal vibration or leakage. Test passed; package returned to automatic mode.
12 May 2026 40001234 50000694 Preventive Completed High Mechanical MECH-48 Monthly firewater pump skid visual inspection No visible leakage. Baseframe and supports in good condition. Inspection completed with no defect raised.
18 Apr 2026 40001102 50000638 Inspection Completed High Mechanical MECH-48 Auto-start test carried out Pump started correctly on test signal. No abnormal vibration observed. No corrective work required.
3 Mar 2026 40000987 50000597 Corrective Completed Medium Mechanical MECH-48 Coupling guard fasteners tightened Two fasteners found loose during routine inspection. Fasteners replaced, torqued and paint-marked.
11 Feb 2026 40000841 50000521 Inspection Completed Low Corrosion INSP-48 Pump skid paint system checked Minor coating breakdown on lower skid edge. Area prepared and touched up; monitor at next inspection.